Yongji City Wastewater Treatment Plant Expansion Project

1 Project Overview

The Yongji City Wastewater Treatment Plant Expansion Project is a key municipal infrastructure upgrade project in Shanxi Province, China, aimed at improving urban wastewater treatment capacity and ensuring stable compliance with increasingly stringent environmental discharge standards.

The project focuses on expanding the existing wastewater treatment capacity to meet growing urban demand while optimizing treatment performance and improving effluent stability. The upgraded system enhances the overall resilience of the municipal water environment protection system.

2 Project Information

ItemDetails
Project NameYongji City Wastewater Treatment Plant Expansion Project
LocationYongji City, Shanxi Province, China
Project TypeMunicipal Wastewater Treatment Expansion
Treatment Capacity30,000 m³/day
Service ObjectUrban domestic sewage system
Contract ModelEPC General Contracting
Core ProcessA²/O Biological Treatment System
ApplicationMunicipal wastewater treatment and discharge compliance

3 Client Challenges

  • Rapid increase in urban wastewater discharge volume

  • Insufficient capacity of existing treatment facilities

  • Stricter national and regional discharge standards

  • Requirement to maintain continuous operation during expansion

  • Limited available land for system expansion

  • Need for stable long-term operational performance

Core Challenge
Expand existing wastewater treatment capacity while ensuring uninterrupted operation and stable effluent compliance

4 Engineering Solution

SYNERAQUA implemented a capacity expansion and process optimization solution based on the A²/O biological treatment process

Process Flow
Domestic Sewage → Screening → Equalization → A²/O Biological Treatment → Secondary Clarification → Disinfection → Effluent Discharge

The system upgrades biological treatment efficiency and hydraulic capacity while maintaining compatibility with existing infrastructure

5 Scope of Work

SYNERAQUA was responsible for full EPC delivery, including

  • Process optimization and expansion design

  • Biological treatment system construction

  • Secondary clarifier system upgrade

  • Electrical and instrumentation works

  • Automation and PLC control system

  • Equipment installation and integration

  • Commissioning and performance testing

  • Operator training and technical support

6 Key Technologies and Engineering Highlights

A²/O Biological Process Upgrade ensures improved nitrogen and phosphorus removal efficiency

Capacity Expansion Engineering enables increased treatment volume without interrupting existing operations

Automated Control System ensures stable and continuous plant operation

Integrated Retrofit Design maximizes use of existing infrastructure

Optimized Hydraulic Design improves system stability under variable load conditions

7 Performance Results

  • Treatment Capacity: 30,000 m³/day

  • Effluent Standard: Class I discharge standard

  • Automation Level: Fully automated operation

  • System Stability: >99 percent operational reliability

  • Continuous Operation: No shutdown during expansion

8 Project Value

The project significantly improves municipal wastewater treatment capacity and supports sustainable urban development in Yongji City

Key contributions include

  • Expanded municipal treatment capacity

  • Maintained continuous plant operation during upgrade

  • Improved effluent quality stability

  • Enhanced regional water environment protection

  • Strengthened urban infrastructure resilience

Contact Us

We would love to speak with you.
Feel free to reach out using the below details.

Get In Touch

Fill out the form below and we will contact you as soon as possible!

Scroll to Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.