Xidan JoyCity Catering Wastewater Treatment System Upgrade Project
1 Project Overview
The Xidan Joy City Catering Wastewater Treatment System Upgrade Project is a key environmental infrastructure renovation project located in the core commercial district of Xidan, Beijing.
The project serves a large-scale commercial complex integrating shopping malls, restaurants, and hotel catering facilities. The wastewater contains high concentrations of oil, grease, and organic matter generated by multiple food service operators.
The system upgrade focuses on improving oil-water separation efficiency, drainage stability, and overall compliance performance under high-density commercial operation conditions.
2 Project Information
| Item | Details |
|---|---|
| Project Name | Xidan Joy City Catering Wastewater Treatment System Upgrade Project |
| Location | Xicheng District, Beijing, China |
| Project Type | Commercial Catering Wastewater Treatment |
| Treatment Capacity | 700–900 m³/day |
| Service Object | Large Commercial Complex |
| Contract Model | EPC General Contracting |
| Core Process | Three-stage oil separation + integrated treatment system |
| Application | Commercial wastewater compliance treatment |
3 Client Challenges
High oil and grease concentration in catering wastewater
Frequent pipeline blockage and backflow issues
Inconsistent performance of existing grease separation system
Limited installation space in underground commercial facilities
High operational complexity under continuous commercial operation
Requirement for uninterrupted business operation during retrofit
Core Challenge
Upgrade the wastewater system without interrupting commercial operations while ensuring stable oil-water separation performance
4 Engineering Solution
SYNERAQUA implemented a three-stage integrated oil-water separation and wastewater treatment system
Process Flow
Catering Wastewater → Three-stage Grease Separation → Integrated Treatment Unit → Drainage Pipeline Upgrade → Monitoring System → Compliance Discharge
Engineering Strategy
Reconstruction of multi-stage oil separation system
Integration of compact wastewater treatment units
Full pipeline system reconstruction and optimization
Intelligent monitoring and remote operation system
Non-stop construction methodology for business continuity
5 Scope of Work
SYNERAQUA was responsible for full EPC delivery, including
Process design and system optimization
Grease separation system reconstruction
Integrated wastewater treatment equipment supply
Pipeline renovation and installation
Electrical and instrumentation works
Automation and monitoring system integration
Commissioning and performance testing
Technical support and training
6 Key Technologies and Engineering Highlights
Three-stage oil separation system achieving ≥98% grease removal efficiency
Compact integrated equipment design suitable for underground commercial space
Intelligent temperature control and remote operation system ensuring stable performance
Traceable grease management system ensuring regulatory compliance
High shock-load resistance design adapting to fluctuating commercial wastewater
7 Performance Results
Treatment Capacity: 700–900 m³/day
Grease Removal Efficiency: ≥98%
System Stability: >99%
Operation Mode: Fully automated operation
Business Continuity: Zero shutdown during construction
8 Project Value
The project significantly improves wastewater management in a high-density commercial environment
Key contributions include
Stable compliance with municipal discharge standards
Elimination of grease blockage issues
Improved commercial environmental quality
Reduced operational and maintenance risks
Ensured uninterrupted commercial operations