Xidan JoyCity Catering Wastewater Treatment System Upgrade Project

1 Project Overview

The Xidan Joy City Catering Wastewater Treatment System Upgrade Project is a key environmental infrastructure renovation project located in the core commercial district of Xidan, Beijing.

The project serves a large-scale commercial complex integrating shopping malls, restaurants, and hotel catering facilities. The wastewater contains high concentrations of oil, grease, and organic matter generated by multiple food service operators.

The system upgrade focuses on improving oil-water separation efficiency, drainage stability, and overall compliance performance under high-density commercial operation conditions.

2 Project Information

ItemDetails
Project NameXidan Joy City Catering Wastewater Treatment System Upgrade Project
LocationXicheng District, Beijing, China
Project TypeCommercial Catering Wastewater Treatment
Treatment Capacity700–900 m³/day
Service ObjectLarge Commercial Complex
Contract ModelEPC General Contracting
Core ProcessThree-stage oil separation + integrated treatment system
ApplicationCommercial wastewater compliance treatment

3 Client Challenges

  • High oil and grease concentration in catering wastewater

  • Frequent pipeline blockage and backflow issues

  • Inconsistent performance of existing grease separation system

  • Limited installation space in underground commercial facilities

  • High operational complexity under continuous commercial operation

  • Requirement for uninterrupted business operation during retrofit

Core Challenge
Upgrade the wastewater system without interrupting commercial operations while ensuring stable oil-water separation performance

4 Engineering Solution

SYNERAQUA implemented a three-stage integrated oil-water separation and wastewater treatment system

Process Flow
Catering Wastewater → Three-stage Grease Separation → Integrated Treatment Unit → Drainage Pipeline Upgrade → Monitoring System → Compliance Discharge

Engineering Strategy

  • Reconstruction of multi-stage oil separation system

  • Integration of compact wastewater treatment units

  • Full pipeline system reconstruction and optimization

  • Intelligent monitoring and remote operation system

  • Non-stop construction methodology for business continuity

5 Scope of Work

SYNERAQUA was responsible for full EPC delivery, including

  • Process design and system optimization

  • Grease separation system reconstruction

  • Integrated wastewater treatment equipment supply

  • Pipeline renovation and installation

  • Electrical and instrumentation works

  • Automation and monitoring system integration

  • Commissioning and performance testing

  • Technical support and training

6 Key Technologies and Engineering Highlights

Three-stage oil separation system achieving ≥98% grease removal efficiency

Compact integrated equipment design suitable for underground commercial space

Intelligent temperature control and remote operation system ensuring stable performance

Traceable grease management system ensuring regulatory compliance

High shock-load resistance design adapting to fluctuating commercial wastewater

7 Performance Results

  • Treatment Capacity: 700–900 m³/day

  • Grease Removal Efficiency: ≥98%

  • System Stability: >99%

  • Operation Mode: Fully automated operation

  • Business Continuity: Zero shutdown during construction

8 Project Value

The project significantly improves wastewater management in a high-density commercial environment

Key contributions include

  • Stable compliance with municipal discharge standards

  • Elimination of grease blockage issues

  • Improved commercial environmental quality

  • Reduced operational and maintenance risks

  • Ensured uninterrupted commercial operations

Contact Us

We would love to speak with you.
Feel free to reach out using the below details.

Get In Touch

Fill out the form below and we will contact you as soon as possible!

Scroll to Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.