Tongrentang Tongke Pharmaceutical Wastewater Treatment Project, Beijing, China

Pharmaceutical Wastewater Treatment System | UASB + MBR + Advanced Biological Process | EPC Delivery

1 Project Overview

The Tongrentang Tongke Pharmaceutical Wastewater Treatment Project is a pharmaceutical wastewater treatment upgrade project located in Tongzhou District, Beijing, China.

The project is invested and operated by Beijing Tongrentang Tongke Pharmaceutical Co., Ltd., a subsidiary of the Tongrentang Group.

The system is designed to treat high-concentration organic wastewater generated from traditional Chinese medicine (TCM) production processes, ensuring stable compliance with strict environmental discharge standards.

2 Project Information

ItemDetails
Project NameTongrentang Tongke Pharmaceutical Wastewater Treatment Project
LocationTongzhou District, Beijing, China
Project TypePharmaceutical Wastewater Treatment
Treatment Capacity500 m³/day
IndustryTraditional Chinese Medicine Manufacturing
Service ScopeEPC / System Upgrade
Core ProcessPretreatment + UASB + MBR
Discharge StandardLocal Class A / Surface water discharge standard

3 Client Challenges

  • High COD concentration (up to ~8000 mg/L)
  • Complex organic compounds (sugars, alkaloids, lignin, pigments)
  • Large fluctuations in influent water quality
  • High requirements for stable biological treatment performance
  • Strict environmental compliance requirements in Beijing
  • Need for system upgrade within existing plant constraints

Core Challenge
Achieve stable treatment of high-strength pharmaceutical wastewater with strong fluctuation and complex organic composition under strict discharge standards

4 Engineering Solution

SYNERAQUA implemented a multi-stage biological treatment system optimized for high-load pharmaceutical wastewater.

Process Flow
Pharmaceutical Wastewater → Physicochemical Pretreatment → UASB Anaerobic Reactor → MBR System → Advanced Filtration → Disinfection → Compliance Discharge

The system combines high-efficiency anaerobic digestion with membrane bioreactor technology to ensure stable COD removal and effluent quality.

5 Scope of Work

  • Process design and system optimization
  • Wastewater treatment system upgrade
  • Equipment supply and integration
  • Electrical and instrumentation works
  • Automation and control system
  • Installation and commissioning
  • Operator training and technical support

6 Key Technologies & Highlights

  • High-load UASB anaerobic system
  • Membrane Bioreactor (MBR) technology
  • Advanced physicochemical pretreatment
  • Stable biological treatment under fluctuating load
  • Automated monitoring and control system

7 Performance Results

  • Treatment capacity: 500 m³/day
  • Effluent COD: < 30 mg/L
  • COD removal efficiency: >95%
  • System stability: >99%
  • Fully automated operation achieved

8 Project Value

The project significantly improves wastewater compliance and environmental performance for pharmaceutical production, ensuring stable and sustainable operation of traditional Chinese medicine manufacturing processes.

Key contributions include:

  • Stable compliance with strict discharge standards
  • Significant improvement in COD removal efficiency
  • Enhanced operational stability of pharmaceutical wastewater system
  • Support for green transformation of TCM industry
  • Reduced environmental risk and improved sustainability
Contact Us

We would love to speak with you.
Feel free to reach out using the below details.

Get In Touch

Fill out the form below and we will contact you as soon as possible!

Scroll to Top
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.